基本解釋[土木建筑工程]設(shè)計(jì)計(jì)算方法設(shè)計(jì)計(jì)算模式英漢例句雙語(yǔ)例句Based on the analysis results, a simplified design calculation method of steel box girder subjected to eccentric load is proposed.在此基礎(chǔ)上,提出了偏心荷載作用下鋼板箱形梁的簡(jiǎn)化設(shè)計(jì)計(jì)算方法。Design calculation method for lug of large diameter and heavy load silo which mount on sensor cell has been introduced, and calculation results of a real engineering has been showed.介紹支承在載荷傳感器上的大直徑大負(fù)荷筒倉(cāng)支座的一種設(shè)計(jì)計(jì)算方法,并給出了一個(gè)工程實(shí)例的設(shè)計(jì)計(jì)算結(jié)果。Through the design of a half-through suspender arch bridge overpassing the expressway, the article discusses the structure and the design calculation method of the half-through arch bridge to be .該文通過(guò)某上跨高速公路的中承式吊桿拱橋的設(shè)計(jì),討論了中承式拱橋的構(gòu)造、設(shè)計(jì)計(jì)算方法,以供借鑒參考。design calculation method更多例句詞組短語(yǔ)短語(yǔ)design and calculation method 設(shè)計(jì)計(jì)算方法design theory and calculation method 設(shè)計(jì)理論和計(jì)算方法calculation design method 計(jì)算設(shè)計(jì)方法calculation and design method 計(jì)算與設(shè)計(jì)方法design calculation method更多詞組專業(yè)釋義土木建筑工程設(shè)計(jì)計(jì)算方法設(shè)計(jì)計(jì)算模式