基本解釋[土木建筑工程]事故甩負(fù)荷英漢例句雙語(yǔ)例句The time history of water hammer in pipeline in the condition of unit emergency load dump is calculated by characteristic line method.在水電站機(jī)組丟棄負(fù)荷情況下,利用特征線(xiàn)法計(jì)算管道內(nèi)的水擊荷載時(shí)間歷程。emergency load dump更多例句詞組短語(yǔ)短語(yǔ)emergency capacity load dump 事故甩負(fù)荷emergency load dump更多詞組專(zhuān)業(yè)釋義土木建筑工程事故甩負(fù)荷