基本解釋[數] 期望風險英漢例句雙語例句Figure 3 presented an expected risk curve for the project, with risks peaking in the early Elaboration phase and declining afterward.圖3展示了這個項目的預期風險曲線圖表,在精化階段出現了風險高峰點,在隨后的階段又逐漸衰退。Tail risk is technically defined as a higher-than-expected risk of an investment moving more than three standard deviations away from the mean.尾部風險的學術定義是一項投資遠高于預期的、價值偏離平均值達到三個標準差以上的風險。The expected risk profile (presenting the sum of the risk ratings for all risks over time) for an effectively managed project was shown in Figure 1.為了有效地管理項目的期望風險的輪廓(展現所有風險的風險等級之和)在圖1中已經展示。原聲例句For example,it says climate change and land use are expected to increase desertification worldwide, increasing the risk of sand and dust storms.That's what this whole theory is about, how to get a lot of expected return without getting a lot of risk.整個金融理論的中心,就是如何獲得高收益,同時降低風險耶魯公開課 - 金融市場課程節(jié)選In fact, different people might make different choices about how much risk they're willing to bear to get a higher expected return.事實上,為了獲得高的預期收益率,人們愿意承受的風險,也會不同。耶魯公開課 - 金融市場課程節(jié)選權威例句Based on prices, the expected risk is low in Treasury securities and investment-grade bonds.FORBES: The Portfolio Solutions 30-Year Market Forecast for 2012expected risk更多例句詞組短語短語expected value risk 期望值風險expected downside risk 期望下方風險minimum expected risk 最小預期風險fuzzy expected risk functional 模糊期望風險泛函expected value at risk 期望在險價值expected risk更多詞組專業(yè)釋義數學期望風險