常見例句雙語例句The 600 tons gantry girder for the two-beam structure is divided into 20 pre-workshop to the final assembly site in place.本課題研究的600噸龍門吊主梁為雙梁結構,共分20段進行車間預制,最后現場就位拼裝。Finally, probably determine the main-beam size of the main girder and end girder in the structure of the metal structure, and it's structure analysis.最后大概確定了橋架結構中主梁和端梁的主要尺寸,并對其進行了有限元分析。The curved beam finite element method, which is based on the theory of curved girder structure analysis, has been adopted for analyzing the curved bridge structure in this Paper.本文根據曲線梁橋的結構分析理論,采用曲桿有限元法對曲線梁橋進行結構分析。 返回 girder beam structure