基本解釋[土木建筑工程]高填方地基英漢例句雙語(yǔ)例句By analyzing the loading acted on culvert, it is an effective way to use integral foundation in culvert on high embankment when the separated foundation is limited.北京市音樂(lè)堂改擴(kuò)建工程采用“兩樁托一柱”的方法,轉(zhuǎn)換結(jié)構(gòu)傳力體系,實(shí)現(xiàn)了基礎(chǔ)整體托換,并增設(shè)了地下室,充分利用地下空間資源。This dissertation summarizes the domestic and external newest achievements on the aspects of the research of high-filling embankment action for bridge pile foundation.本文綜述了國(guó)內(nèi)外在軟土高填土路堤對(duì)橋臺(tái)樁基作用方面的最新成果。The shape and location of the slip curve surface, the ultimate bearing capacity under load were found out when the high fill embankment on slope foundation was under unstable condition.結(jié)合山區(qū)高速公路建設(shè)的實(shí)踐,采用足尺模型試驗(yàn),得出荷載作用下斜坡地基上高填方路堤滑動(dòng)破壞面出現(xiàn)的位置及形態(tài),并測(cè)定了其相應(yīng)的極限承載力。high embankment foundation更多例句專業(yè)釋義土木建筑工程高填方地基