常見例句The increase in nominal stress due to live load, BC, is usually small in comparison with the dead load, OA. 活載產(chǎn)生的名義應(yīng)力的增量BC段與恒載產(chǎn)生的名義應(yīng)力OA段相比一般是很小的。Conventional plane frame programs amplify the live load effect using the amplification coefficient when computing the stress of live load. 在計(jì)算活載應(yīng)力時(shí),常規(guī)的平面桿系計(jì)算程序采用放大系數(shù)的近似處理方法。The use of hollow pots, in conjunction with reinforced concrete, reduces the dead weight and, therefore, permits a greater life load to be carried. 實(shí)心板與鋼筋混凝土梁整澆在一起,可以減少自重以便承受更多的活荷載。The fatigue life of railway bridge mostly lies on the constructional details of the bridge structure,characteristics of live load action effect,and times of live load actions. 鐵路橋梁結(jié)構(gòu)的疲勞壽命主要取決于橋梁結(jié)構(gòu)構(gòu)造細(xì)節(jié)、活載作用效應(yīng)特征和活載作用次數(shù)。This paper put forward a new pre-produced tensegrity structure,and analyzed the structure under the dead load and live load through a simulation procedure. 提出了一種新型的預(yù)制類張拉整體結(jié)構(gòu),通過(guò)仿真的方法對(duì)結(jié)構(gòu)進(jìn)行均布荷載作用下的受力分析,并根據(jù)內(nèi)力分布的特點(diǎn)確定了相應(yīng)的施工方法。To evaluate fracture instability, the total sum of stresses due to residual welding or rolling stresses, dead load, and live loads must be considered. 計(jì)算斷裂失穩(wěn)性時(shí),必須考慮焊接或軋制殘余應(yīng)力,恒載應(yīng)力和活載應(yīng)力之總和。 返回 live load