基本解釋甩負(fù)荷試驗英漢例句雙語例句Load dump anticipation(LDA) function are one of the important steps to ensure the success of the steam turbine load dump test, and this circumstance is vary rare.甩負(fù)荷預(yù)測功能是確保機(jī)組成功進(jìn)行甩負(fù)荷的一項重要措施,大型汽輪機(jī)組中發(fā)生該功能失效的情況很少見。The DEH system of the back pressure turbine of thermal power plant is presented in detail and the load dump test used the conventional method is developed successfully.以某熱電廠背壓式汽輪機(jī)數(shù)字電液調(diào)節(jié)系統(tǒng)(DEH)為例,介紹了該機(jī)組DEH系統(tǒng)的構(gòu)成、特點(diǎn)以及機(jī)組DEH改造后采用常規(guī)法甩負(fù)荷試驗的情況。load dump test更多例句詞組短語短語load -dump test -rejection test 甩負(fù)荷試驗steam turbine load dump test 汽輪機(jī)甩負(fù)荷試驗study on load dump test 甩負(fù)荷試驗研究load dump test更多詞組