基本解釋[水利工程]碾壓混凝土溢流壩英漢例句雙語(yǔ)例句Based on Longtan project, temperature control and crack prevention of a typical overflow section block of the high RCC gravity dam is studied as a case study.以“十·五”國(guó)家電力公司科技攻關(guān)項(xiàng)目為背景,深入系統(tǒng)地進(jìn)行了龍灘高碾壓混凝土重力壩典型溢流壩段的溫控防裂研究。Roller compacted concrete (RCC) will be used in section No. 6-No. 15 of the spillway dam, section No. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan'an Project.萬安水電站二期主體工程溢流壩6~15壩段、左岸非溢流壩5壩段和左導(dǎo)墻部分?jǐn)M采用碾壓混凝土筑壩技術(shù)。rcc overflow dam更多例句專業(yè)釋義水利工程碾壓混凝土溢流壩