基本解釋[交通運(yùn)輸工程]合理成橋狀態(tài)英漢例句雙語(yǔ)例句The structural analysis for perfectly finished state and reasonable construction state of cable-stayed bridge is the focal and key point of the design.斜拉橋理想成橋狀態(tài)與合理施工狀態(tài)的結(jié)構(gòu)分析是其設(shè)計(jì)的重點(diǎn)和難點(diǎn)。The static analysis of the cable-stayed bridge is usually carried through two steps: determining of the reasonable finished state and the reasonable construction state.斜拉橋的靜力分析計(jì)算一般分兩步進(jìn)行:合理成橋狀態(tài)的確定和合理施工狀態(tài)的確定。In this paper, a concept of reasonable finished dead state of cable-stayed bridges and existing methods of cable tension optimization for cable-stayed bridges are firstly introduced.本文首先介紹斜拉橋合理成橋狀態(tài)的概念和現(xiàn)有的斜拉橋索力優(yōu)化方法。reasonable finished state更多例句詞組短語(yǔ)短語(yǔ)the reasonable finished state 合理成橋狀態(tài)reasonable finished dead state 合理成橋狀態(tài)reasonable finished state更多詞組專(zhuān)業(yè)釋義交通運(yùn)輸工程合理成橋狀態(tài)Study the sensitiveness of the optimization target on internal forces of finished state,attempt to simplify the method of optimization of cable tension in reasonable finished state of single diagonal-span arch bridge.分析了成橋狀態(tài)對(duì)于所優(yōu)化目標(biāo)參數(shù)的敏感性,嘗試對(duì)斜跨式異型拱橋合理成橋狀態(tài)的確定方法進(jìn)行簡(jiǎn)化。