常見(jiàn)例句雙語(yǔ)例句The CRP (Capacity requirements planning) is one part of ERPsystem, which plays an important feedback role in ERP.能力需求計(jì)劃(CRP)是ERP的一個(gè)重要組成部分,它在ERP中起著重要的反饋?zhàn)饔谩?/li>It was studied that Theory of Material Requirements Planning and designed of Material Requirements Planning System.對(duì)物料需求計(jì)劃的理論和方法進(jìn)行研究,并對(duì)物料需求計(jì)劃系統(tǒng)進(jìn)行邏輯計(jì)劃。By means of mathematical deduction, the model can be transformed into a linear programming problem and the JIT distribution requirements planning approach is presented.然后通過(guò)數(shù)學(xué)推導(dǎo),將其轉(zhuǎn)換成一個(gè)線性規(guī)劃問(wèn)題,提出了準(zhǔn)時(shí)化分布需求計(jì)劃方法。權(quán)威例句In addition, State and local agencies have different acquisition requirements, planning cycles and technical requirements.WHITEHOUSE: Testimony of Karen EvansAlso being considered are environmental requirements for companies planning to list their shares publicly, and a tax on polluters.ECONOMIST: Environmental protection in ChinaIn the capital planning and investment control process, there are two separate and distinct plans that address IRM and IT planning requirements for the agency.WHITEHOUSE: CIRCULAR NO. A-130 Revised 返回 requirements planning