基本解釋[經(jīng)濟學]執(zhí)行合同英漢例句雙語例句Due to the force majeure causes any party is unable to perform a contract due to force majeure, should be in 3 days after the event notification, try to reduce the loss.任何一方由于不可抗力原因不能履行合同時,應在不可抗力事件發(fā)生后3日內(nèi)通知對方,盡力減少損失。Article 107 Civil liability shall not be borne for failure to perform a contract or damage to a third party if it is caused by force majeure, except as otherwise provided by law.第一百零七條 因不可抗力不能履行合同或者造成他人損害的,不承擔民事責任,法律另有規(guī)定的除外。This system demonstrates the equality and justice of law , and is a legal remedy to the client when it is obviously unfair to perform a contract in the case that some unforeseen risks exist.該制度體現(xiàn)了法的公平正義精神,系對當事人因不正常風險致使合同履行顯失公平時的法律救濟。權(quán)威例句Those are the facts necessary to satisfy the elements of a claim for, say, breach of contract: promise, consideration, failure to perform, causation and damages, or the requirements of an affirmative defense: impossibility of performance, for instance.FORBES: Relevance and Strategyto perform a contract更多例句詞組短語短語fail to perform a contract 未履行合同to perform a contract更多詞組專業(yè)釋義經(jīng)濟學執(zhí)行合同