常見例句雙語例句In this paper, three typical scheme design on mucking and transporting system of tunnel boring machine is studied, and the dispatch of the equipment in .本文在研究隧洞掘進(jìn)機(jī)開挖隧洞出碴及材料運(yùn)輸三種典型方案后,對其調(diào)度方案進(jìn)行了設(shè)計計算。To improve the capacity and efficiency of the design system of backup transportation scheme for tunnel boring machine(TBM), a new hybrid-solving method was proposed.為提高隧道掘進(jìn)機(jī)后配套運(yùn)輸方案設(shè)計系統(tǒng)的能力和效率,提出了一種工程裝備方案設(shè)計的混合求解方法。In order to rationalize type selection of the full face rock tunnel boring machine, a comprehensive solution substituting the empirical choosing method is presented.為了使隧道掘進(jìn)機(jī)選型決策理性化,避免單純依靠設(shè)計者的經(jīng)驗(yàn)進(jìn)行選型,研究一種綜合解決方案。 返回 tunnel boring machine