常見例句The Laxiwa dam will be in a condition for reservoir impoundment at the end of the year 2008 in accordance with the fixed progress schedule. 根據已經確定的施工進度計劃安排,拉西瓦大垻將於2008年底具備下牐蓄水條件。Because two tailrace tunnels of Laxiwa Hydropower Station are big in its diameter,the concrete lining adopted the way of "first bottom and then side and top arch". 拉西瓦水電站兩條大洞逕的尾水洞,採用先底拱、後邊頂拱的混凝土澆築方式。The article introduces courses of selecting air cooling mode and adoptive corresponding measures for hydrogenerator of Longtan, Xiaowan and Laxiwa hydropower station. 介紹了龍灘、小灣和拉西瓦水電站水輪發(fā)電機空冷方案的確定歷程及所採取的相應措施;A cantilever beam and Laxiwa dam-base system are analyzed in details by using proposed method.The results show that the 3D EFGM is effective and accurate for problems in geotechnique engineering. 應用該程序對懸臂梁算例和拉西瓦拱垻-地基模型進行彈性分析,結果表明該方法有傚可行。ZHOU Wei-yuan, YAN Gong-rui, YANG Ruo-qiong.Elasto-brittle damage model for rockmass based on field tests in laxiwa arch damsite[J].Chinese Journal of Geotechnical Engineering, 1998,20(5): 54-57. [4]周維垣;剡公瑞;楊若瓊.;巖躰彈脆性損傷本搆模型及工程應用[J]Laxiwa Hydropower Station on Yellow River 拉西瓦水電站 返回 Laxiwa