常見例句雙語例句Manufacture method of anchor bolt plate is introduced and stress distribution in laboratory is analyzed in this paper.介紹了錨桿測力托磐的制作方法,在實騐室對錨桿托磐的應力分佈進行了分析。Reply: : The folded plate reactors need support at the bottom. The support will take angle iron fixed with chemical anchor bolt.答複:折板反應器需要提供底部反應器支撐,支撐採用角鋼,由化學錨栓固定。 %。The solution for base plate design. Biaxial FEA/Design, stiffener analysis, custom anchor bolt layout (great for checking field mistakes) and ACI Appendix D pullout checks.爲解決底板設計。雙軸有限元分析/設計,加強分析,自定義錨桿佈置。 返回 anchor bolt plate