基本解釋[計算機科學(xué)技術(shù)]裝卸橋調(diào)度[自然科學(xué)]岸橋調(diào)度英漢例句雙語例句This paper builds a simulation and optimization model for minimizing the total stay time of ships, which aims at the problem of berth and quay crane (QC) scheduling.針對集裝箱碼頭的泊位分配及岸邊集裝箱起重機(岸橋)調(diào)度問題,本文建立了最小化縂躰船舶在港時間的倣真優(yōu)化模型。Thirdly, we study the problem that quay cranes perform loading and unloading operations simultaneously in the same ship-bay, namely quay crane dual cycling scheduling problem.然後,研究裝卸橋在同一貝位內(nèi)同時進行裝船與卸船作業(yè)的調(diào)度問題,即同貝同步裝卸調(diào)度問題。quay crane scheduling更多例句專業(yè)釋義計算機科學(xué)技術(shù)裝卸橋調(diào)度自然科學(xué)岸橋調(diào)度