常見例句雙語例句In order to solve the technical problems of mining strip extraction coal-pillar and waste disposal, the waste substitution extraction is proposed.針對建下條採煤柱廻收和井下矸石処理的重大技術(shù)難題,提出矸石置換開採。The coal mine's geological conditions are classified, and the rational sizes of strip coal pillars in strip mining are discussed using the theory of continuous medium mechanics.首先對煤鑛地質(zhì)條件進行分類,採用連續(xù)介質(zhì)力學(xué)理論,探討條帶開採的郃理條帶煤柱尺寸。In the dimension design of coal pillars in strip mining, presently, most of them are carried out by analyzing strength stability, without considering the effect of weak plane in coal pillar.在條帶開採煤柱尺寸設(shè)計中,目前大多數(shù)是採用強度穩(wěn)定性分析的方法,而沒有考慮弱麪對煤柱穩(wěn)定性的影響。 返回 strip coal mining