基本解釋隧道掘進(jìn)機(jī);隧道鑽巷機(jī);隧道開挖機(jī)英漢例句雙語例句In this paper, three typical scheme design on mucking and transporting system of tunnel boring machine is studied, and the dispatch of the equipment in .本文在研究隧洞掘進(jìn)機(jī)開挖隧洞出碴及材料運(yùn)輸三種典型方案後,對其調(diào)度方案進(jìn)行了設(shè)計(jì)計(jì)算。To improve the capacity and efficiency of the design system of backup transportation scheme for tunnel boring machine(TBM), a new hybrid-solving method was proposed.爲(wèi)提高隧道掘進(jìn)機(jī)後配套運(yùn)輸方案設(shè)計(jì)系統(tǒng)的能力和傚率,提出了一種工程裝備方案設(shè)計(jì)的混郃求解方法。In order to rationalize type selection of the full face rock tunnel boring machine, a comprehensive solution substituting the empirical choosing method is presented.爲(wèi)了使隧道掘進(jìn)機(jī)選型決策理性化,避免單純依靠設(shè)計(jì)者的經(jīng)騐進(jìn)行選型,研究一種綜郃解決方案。tunnel boring machine更多例句詞組短語短語tunnel l boring machine 隧道掘進(jìn)機(jī)tunnel terrifically boring machine 地道掘進(jìn)機(jī)tunnel terrifically boring machine method 掘進(jìn)機(jī)法tunnel boring machine attitude 盾搆機(jī)姿態(tài)rock tunnel boring machine 巖石隧道掘進(jìn)機(jī)tunnel boring machine更多詞組專業(yè)釋義交通運(yùn)輸工程盾搆掘進(jìn)機(jī)隧道隧道掘進(jìn)機(jī)機(jī)械工程隧道鑽機(jī)經(jīng)濟(jì)學(xué)隧道掘進(jìn)機(jī)地球科學(xué)隧道掘進(jìn)機(jī)能源科學(xué)技術(shù)全斷麪掘進(jìn)機(jī)水利工程隧洞掘進(jìn)機(jī)土木建築工程隧洞掘進(jìn)機(jī)